Photos

Keyword: Category: Tag: Sort By:
Airmen from the 210th Engineering Installation Squadron prepares fiber optic wire for a future temporary duty assignment in St. Paul, Minn., Mar. 16, 2013. The Airmen will be installing about 1.25 miles of the fiber optic wire into buildings. 
(U.S. Air Force photo by Staff Sgt. Amy M. Lovgren/Released)


210th Engineering Installation Squadron

Airmen from the 210th Engineering Installation Squadron prepares fiber optic wire for a future temporary duty assignment in St. Paul, Minn., Mar. 16, 2013. The Airmen will be installing about 1.25 miles of the fiber optic wire into buildings. (U.S. Air Force photo by Staff Sgt. Amy M. Lovgren/Released)

Related Imagery
Staff Sgt. Amy M. LovgrenReleased
130329-F-JZ004-534.JPG

DOWNLOAD PHOTO
(3.89 MB)



Tags
New Photos



< Back to Main Gallery