210th EIS connects PSAB
Senior Airman Blase Nyberg, 210th Engineering Installation Squadron cable and antenna systems specialist, cleans up his work area while installing fiber optic cable at Prince Sultan Air Base, Saudi Arabia on Nov. 5, 2019. Airmen with the 210th EIS are installing approximately 120,000 feet of cable, increasing the capability, reliability and security of the networks at PSAB. PSAB will serve as a strategic operating location for U.S. Air Forces Central Command and U.S. Central Command and fills a mutually beneficial role of countering destabilizing regional activity. (U.S. Air Force photo by Tech. Sgt. John Wilkes)